[1]蔡莉莉,方金,范亮,J.Fang,L.Fan,预制-装配式组合梁剪力群钉推出试验研究,科学技术与工程,21(2021)9947-9953.
[2]Y.Hu,M.Qiu,L.Chen,R.Zhong,J.Wang,Experimentalandanalyticalstudyoftheshearstrengthandstiffnessofstudsembeddedinhighstrengthconcrete,EngineeringStructures,236(2021).
[3]J.Ding,J.Zhu,J.Kang,X.Wang,Experimentalstudyongroupedstudshearconnectorsinprecaststeel-UHPCcompositebridge,EngineeringStructures,242(2021).
[4]S.Wang,Z.Fang,G.Chen,H.Jiang,S.Teng,NumericalAnalysisonShearBehaviorofGroupedHeadStudShearConnectorsbetweenSteelGirdersandPrecastConcreteSlabswithHigh-StrengthConcrete-FilledShearPockets,JournalofBridgeEngineering,26(2021).
[5]Y.Huang,S.Chen,P.Gu,StaticandfatiguebehaviorofshearstudconnectionembeddedinUHPC,Structures,34(2021)2777-2788.
[6]Q.Zhao,G.Huang,C.Xu,Y.Peng,Push-OutBehaviorofShortHeadedStudConnectorsinSteel-UltraHighPerformanceConcreteCompositeDeck,KSCEJournalofCivilEngineering,25(2021)2640-2650.
[7]Q.Xu,K.Lu,J.Wang,Y.Yao,Performanceoflarge-diameterstudsinthinultra-highperformanceconcreteslab,Structures,34(2021)4936-4951.
[8]李萌,邵旭东,曹君辉,何广,陈玉宝,赵旭东,UHPC中短栓钉抗剪性能试验及理论分析,中国公路学报,34(2021)191-204.
[9]A.A.Dnmez,Sizeeffectontheshearcapacityofheadedstuds,AdvancesinStructuralEngineering,24(2020)815-826.
[10]J.Zhang,X.Hu,J.Wu,Y.M.Lim,S.Gong,R.Liu,Shearbehaviorofheadedstudconnectorsinsteel-MPCbasedhighstrengthconcretecompositebeams,EngineeringStructures,249(2021).
[11]Y.Hu,R.Zhong,M.Meloni,J.Wang,ANovelShearStrengthPredictionApproachforHeadedShearStudsEmbeddedinUltrahigh-PerformanceConcrete,JournalofStructuralEngineering,147(2021).
[12]Y.Zhan,S.Lu,Y.Zheng,H.Jiang,S.Xiong,TheoreticalStudyontheInfluenceofWeldingCollarontheShearBehaviorofStudShearConnectors,KSCEJournalofCivilEngineering,25(2021)1353-1368.
[13]H.Su,Q.Su,C.Xu,X.Zhang,D.Lei,Shearperformanceanddimensionrationalizationstudyontherubbersleevedstudconnectorincontinuouscompositegirder,EngineeringStructures,240(2021).
[14]M.Sjaarda,J.S.West,S.Walbridge,Reliabilityanalysisofweldedstudshearconnectorsonsimply-supportedbridgegirders,CanadianJournalofCivilEngineering,48(2021)604-615.
[15]石广玉,李广耀,基于断裂力学的钢-UHPC组合结构中栓钉的疲劳寿命评估,长安大学学报(自然科学版),41(2021)102-113.
[16]J.Xu,H.Sun,W.Chen,X.Guo,Experiment-BasedFatigueBehaviorsandDamageDetectionStudyofHeadedShearStudsinSteel–ConcreteCompositeBeams,AppliedSciences,11(2021).
[17]X.Xu,X.Zhou,Y.Liu,Fatiguelifepredictionofrubber-sleevedstudshearconnectorsundershearloadbasedonfiniteelementsimulation,EngineeringStructures,227(2021).
[18]D.Wang,B.Tan,L.Wang,F.Chen,S.Xiang,NumericalStudyonStressIntensityFactorsforStudConnectorsofSteel–ConcreteConnection,InternationalJournalofSteelStructures,21(2021)1775-1789.
[19]K.Tian,J.Obolt,Concretepry-outfailureofsingleheadedstudanchorsafterfireexposure:Experimentalandnumericalstudy,EngineeringStructures,232(2021).
[20]X.Xu,D.He,S.Zeng,W.He,H.Tan,Z.Yu,Effectofconcretecracksonthecorrosionofheadedstudsinsteelandconcretecompositestructures,ConstructionandBuildingMaterials,293(2021).
[21]A.Suzuki,Y.Kimura,Mechanicalperformanceofstudconnectioninsteel-concretecompositebeamunderreversedstress,EngineeringStructures,249(2021).
[22]L.-D.Zhuang,H.-B.Chen,Y.Ma,R.Ding,ResearchonWhole-ProcessTensileBehaviorofHeadedStudsinSteel–ConcreteCompositeStructures,InternationalJournalofConcreteStructuresandMaterials,15(2021).
[23]F.Li,H.Gao,Y.Jiang,T.Wen,Y.Zhan,Z.Chen,D.Shen,Tensilebehaviorofstudconnectorsinhighstrengthconcrete,AdvancesinStructuralEngineering,24(2021)3677-3690.
[24]谢剑,亢二聪,严加宝,朱冠儒,E.Kang,J.Yan,G.Zhu,低温环境下栓钉连接件抗拉拔性能研究,建筑结构学报,42(2021)386-394.
[25]罗云标,齐连训,严加宝,李忠献,L.Qi,J.Yan,Z.Li,可拆卸组合梁剪力连接件抗剪性能数值分析,建筑科学与工程学报,38(2021)117-126.
[26]齐连训,罗云标,严加宝,林旭川,Y.Luo,J.Yan,X.Lin,高变形能力螺栓抗剪连接件抗剪承载力理论分析与验证,工程力学,38(2021)74-82.
[27]王宣鼎,沈敏慧,锺國輝,刘界鹏,廖岳,靳泽中,M.Shen,G.Zhong,J.Liu,Y.Liao,Z.Jin,大直径高强螺栓剪力件受剪性能研究,建筑结构学报,42(2021)427-434.
[28]何余良,周仁甫,胡立普,曹宗勇,项贻强,混杂纤维混凝土螺栓剪力键疲劳性能,长安大学学报(自然科学版),41(2021)95-105.
[29]W.Wang,X.-d.Zhang,F.-x.Ding,X.-l.Zhou,FiniteElementAnalysisonShearBehaviorofHigh-StrengthBoltedConnectorsunderInversePush-OffLoading,Energies,14(2021).
[30]E.Tzouka,T.Karavasilis,M.M.Kashani,S.Afshan,Finiteelementmodellingofpush-outtestsfornovellockingnutshearconnectors,Structures,33(2021)1020-1032.
[31]F.Yang,Y.Liu,H.Xin,M.Veljkovic,Fracturesimulationofademountablesteel-concreteboltedconnectorinpush-outtests,EngineeringStructures,239(2021).
[32]D.Kruszewski,A.E.Zaghi,Loadtransferbetweenthinsteelplatesandultra-highperformanceconcretethroughdifferenttypesofshearconnectors,EngineeringStructures,227(2021).
[33]S.M.Hosseini,F.Mashiri,O.Mirza,Parametricstudyofinnovativeboltedshearconnectorsusing3Dfiniteelementmodelling,JournalofConstructionalSteelResearch,179(2021).
[34]A.Ataei,M.Zeynalian,Astudyonstructuralperformanceofdeconstructableboltedshearconnectorsincompositebeams,Structures,29(2021)519-533.
[35]A.A.Chiniforush,A.Ataei,M.A.Bradford,Experimentalstudyofdeconstructableboltshearconnectorssubjectedtocyclicloading,JournalofConstructionalSteelResearch,183(2021).
[36]H.Jiang,H.Fang,J.Liu,Z.Fang,J.Zhang,Experimentalinvestigationonshearperformanceoftransverseangleshearconnectors,Structures,33(2021)2050-2060.
[37]X.Wang,Q.He,Z.An,G.Liu,X.Wen,Y.Wang,Z.Zhong,ExperimentalStudyofPerfobondRibShearConnectorunderLateralForce,AppliedSciences,11(2021).
[38]F.Wu,S.Liu,C.Xue,K.Yang,Y.Feng,H.Zhang,ExperimentalStudyontheMechanicalPropertiesofPerfobondRibShearConnectorswithSteelFiberHighStrengthConcrete,Materials(Basel),14(2021).
[39]S.He,P.Guan,Q.Wang,Z.Fang,A.Mosallam,Investigationonstructuralperformanceofperfobondstripconnectorgroupinsteel-concretejoints,EngineeringStructures,242(2021).
[40]W.Wang,Z.Yi,B.Tian,Y.Zhang,S.Lu,NonlinearfiniteelementanalysisofPBLshearconnectorsinhybridstructures,Structures,33(2021)4642-4654.
[41]黄彩萍,游文峰,谭金甲,杨艳霜,甘书宽,W.You,J.Tan,Y.Yang,S.Gan,弯折贯穿钢筋PBL剪力键力学性能试验,土木工程与管理学报,38(2021)113-120.
[42]刘传奇,孔凡磊,F.Kong,开孔板加劲型压型钢板加固混凝土界面黏结-滑移机理科学技术与工程,21(2021)3333-3338.
[43]孔凡磊,黄平明,陆由付,夏建平,梅葵花,P.Huang,Y.Lu,J.Xia,K.Mei,PBL和PZ组合销剪力连接件承载力试验研究,公路交通科技,38(2021)79-86.
[44]F.Kong,P.Huang,B.Han,X.Wang,C.Liu,Experimentalstudyonbehaviorofcorrugatedsteel-concretecompositebridgedeckswithMCLshapecompositedowels,EngineeringStructures,227(2021).
[45]A.Suzuki,K.Abe,K.Suzuki,Y.Kimura,CyclicBehaviorofPerfobond-ShearConnectorsSubjectedtoFullyReversedCyclicLoading,JournalofStructuralEngineering,147(2021).
[46]Y.Liu,H.Xin,Y.Liu,Experimentalandanalyticalstudyontensileperformanceofperfobondconnectorinbridgeengineeringapplication,Structures,29(2021)714-729.
[47]A.Suzuki,K.Suzuki,Y.Kimura,Ultimateshearstrengthofperfobondshearconnectorssubjectedtofullyreversedcyclicloading,EngineeringStructures,248(2021).
[48]Y.Gao,C.Li,X.Wang,Z.Zhou,L.Fan,J.Heng,Shear-slipbehaviourofprefabricatedcompositeshearstudconnectorsincompositebridges,EngineeringStructures,240(2021).
[49]曾丹,刘扬,曹磊,Y.Liu,L.Cao,钢-UHPC组合结构新型剪力件的抗剪性能,浙江大学学报(工学版),55(2021)1714-17241771.
[50]程震宇,UHPC中MCL形组合销的抗剪性能,中国公路学报,34(2021)205-217.
[51]S.-H.Kim,T.Batbold,S.H.A.Shah,S.Yoon,O.Han,DevelopmentofShearResistanceFormulafortheY-TypePerfobondRibShearConnectorConsideringProbabilisticCharacteristics,AppliedSciences,11(2021).
[52]S.-H.Kim,O.Han,S.Yoon,T.Boldoo,ShearResistanceAssessmentoftheY-TypePerfobondRibShearConnectorunderRepeatedLoadings,AppliedSciences,11(2021).
[53]K.Nouri,N.H.R.Sulong,Z.Ibrahim,M.Shariati,BehaviourofNovelStiffenedAngleShearConnectorsatAmbientandElevatedTemperatures,AdvancedSteelConstruction,17(2021)28-38.
[54]B.Maghaghi,M.Titoum,A.Mazoz,Experimentalevaluationofnewchannelshearconnectorshapes,InternationalJournalofSteelStructures,21(2021)883-900.
[55]D.Arévalo,L.Hernández,C.Gómez,G.Velasteguí,E.Guaminga,R.Baquero,R.Dibujés,Structuralperformanceofsteelangleshearconnectorswithdifferentorientation,CaseStudiesinConstructionMaterials,14(2021).
[56]M.I.Tabet-Derraz,A.Khelil,K.Hamdaoui,N.Boumechra,M.Abdallah,ExperimentalandnumericalstudyofaninnovativeOMEGA-shapedconnectorforcompositebeams,Structures,32(2021)279-297.
[57]Y.Zou,F.Qin,J.Zhou,Z.Zheng,Z.Huang,Z.Zhang,Shearbehaviorofanovelbearing-shearconnectorforprefabricatedconcretedecks,ConstructionandBuildingMaterials,268(2021).
[58]Y.Yang,W.Liang,Q.Yang,Y.Cheng,Flexuralbehaviorofwebembeddedsteel-concretecompositebeam,EngineeringStructures,240(2021).
[59]Y.Yao,M.Yan,Z.Shi,Y.Wang,Y.Bao,Mechanicalbehaviorofaninnovativesteel–concretejointforlong-spanrailwayhybridboxgirdercable-stayedbridges,EngineeringStructures,239(2021).
[60]施州,姜兴洪,高贵,等,高铁大跨度混合梁斜拉桥钢-混结合段受力特性分析,桥梁建设,51(2021)62-70.
[61]Y.Zou,K.Zheng,J.Zhou,Z.Zhang,X.Li,Mechanicalbehaviorofperfobondconnectorgroupinsteel–concretejointofhybridbridge,Structures,30(2021)925-936.
[62]Y.Zhan,M.Duan,L.Zhang,C.Liu,Z.Li,R.Zhao,Studyontheshearperformanceofadhesiveshearconnectorsinpush-outtests,Structures,32(2021)2103-2117.
[63]吴启明,姜瑞娟,徐添华,等,考虑腹板剪切变形的波形钢腹板组合箱梁剪力滞效应分析,建筑结构学报,42(2021)229-238.
[64]冀伟,孙斌,白倩,罗奎,B.Sun,Q.Bai,K.Luo,长期荷载作用下钢-混凝土组合梁的挠度计算与分析%J湖南大学学报(自然科学版),48(2021)51-60.
[65]陈旭,章胜平,王春华,等,钢-混连续组合梁的徐变等温法,公路交通科技,38(2021)73-80.
[66]谢上飞,钢-超高性能混凝土组合梁剪力滞分析的有限梁段法_,铁道科学与工程学报,18(2021)440-449.
[67]周茂定,蔺鹏臻,张元海,基于广义位移的波形钢腹板组合箱梁有限梁段分析方法,东南大学学报(自然科学版),51(2021)747-753.
[68]秦翱翱,刘世忠,冀伟,等,单箱双室钢底板波形钢腹板组合箱梁扭转性能分析,东南大学学报(自然科学版),51(2021)740-746.
[69]王力,刘世忠,路韡,新型波形钢腹板组合箱梁温度效应_,浙江大学学报(工学版),55(2021)675-683.
[70]张元海,孙成成,波形钢腹板箱梁考虑腹板局部纵向刚度影响的扭转效应分析_,东南大学学报(自然科学版),51(2021)195-201.
[71]吴启明,肖玉凤,郭宗明,等,单箱多室波形钢腹板组合箱梁腹板剪力分配理论,建筑钢结构进展,23(2021)61-66.
[72]K.Benyahi,Y.Bouafia,M.Oudjene,S.Barboura,M.S.Kachi,NumericalProcedurefortheThree-DimensionalNonlinearModellingofCompositeSteel–ConcreteBeams,InternationalJournalofSteelStructures,21(2021)1063-1081.
[73]Z.Yang,M.Yang,X.Rong,L.Tian,TheoreticalandNumericalStudyonDynamicCharacteristicsofCompositeTroughGirderwithCorrugatedSteelWebs,JournalofBridgeEngineering,26(2021).
[74]J.Zhu,X.Guo,J.Kang,M.Duan,Y.Wang,ExperimentalInvestigationofFlexuralBehaviorofSteel–UHPCCompositeBeamwithWaffle-SlabSystem,JournalofBridgeEngineering,26(2021).
[75]R.S.Nicoletti,A.Rossi,A.S.C.deSouza,C.H.Martins,Numericalassessmentofeffectivewidthinsteel-concretecompositeboxgirderbridgeswithpartialinteraction,EngineeringStructures,239(2021).
[76]刘汗青,钟琼,霍静思,陈俊,预制装配式栓钉连接件钢-混凝土组合梁抗弯性能试验研究,建筑钢结构进展,23(2021)1-8.
[77]X.Xie,Y.Huang,X.Qin,ANewCompositeTrussBridgeandaStudyonItsDynamicCharacteristicswithFEandExperimentalMethods,KSCEJournalofCivilEngineering,25(2021)931-947.
[78]H.Du,X.Hu,D.Shi,W.Xue,FlexuralPerformanceofCompositeBeamsUsingHigh-StrengthSteelandHigh-StrengthConcrete,InternationalJournalofSteelStructures,DOI10.1007/s13296-021-00558-y(2021).
[79]A.Kamar,M.Lasheen,A.Shaat,A.Zaher,A.Khalil,Factorsaffectingslipandstressdistributionofconcreteslabsincompositebeams,EngineeringStructures,245(2021).
[80]A.Daou,A.R.Mahayri,Y.Daou,O.Baalbaki,M.Khatib,TheUseofShearConnectorsforEnhancingthePerformanceofSteel–ConcreteCompositeBeams:ExperimentalandNumericalAssessment,InternationalJournalofSteelStructures,21(2021)1966-1976.
[81]赵品,荣学亮,叶见曙,陈伟,王国安,波形钢腹板箱梁的腹板受力性能及桥面板横向内力分析,江苏大学学报(自然科学版),42(2021)367-372.
[82]J.Dong,Y.Chen,Q.Wu,A.Hu,R.Jiang,C.Wang,Z.Tong,H.Song,T.Xu,Researchonflexuralbehaviorofcompositeboxcontinuousgirderwithcorrugatedsteelwebsandtrusses,AdvancesinStructuralEngineering,24(2021)3580-3593.
[83]W.Deng,D.Liu,Z.Peng,J.Zhang,BehaviorofCantileverCompositeGirderBridgeswithCSWsunderEccentricLoading,KSCEJournalofCivilEngineering,25(2021)3925-3939.
[84]Y.Zhu,S.Wan,K.Shen,P.Zhou,X.Wang,Theoreticalstudyonthenonlinearperformanceofsingle-boxmulti-cellcompositebox-girderwithcorrugatedsteelwebsunderpuretorsion,JournalofConstructionalSteelResearch,178(2021).
[85]Y.Wang,X.Shao,X.Zhang,J.Cao,X.Zhao,S.Deng,StructuralBehaviorsofaLow-ProfileSteelPlate-ReinforcedUHPCDeckPanelwithLongitudinalRibs,JournalofBridgeEngineering,26(2021)04021043.
[86]Z.Cheng,Q.Zhang,Y.Bao,P.Deng,C.Wei,M.Li,Flexuralbehaviorofcorrugatedsteel-UHPCcompositebridgedecks,EngineeringStructures,246(2021).
[87]J.-L.Xiao,M.Zhou,J.-G.Nie,T.-Y.Yang,J.-S.Fan,Flexuralbehaviorofsteel-UHPCcompositeslabswithperfobondribshearconnectors,EngineeringStructures,245(2021).
[88]F.Gara,S.Carbonari,G.Leoni,L.Dezi,FiniteElementsforHigherOrderSteel–ConcreteCompositeBeams,AppliedSciences,11(2021).
[89]Y.Zhou,B.Uy,J.Wang,D.Li,Z.Huang,X.Liu,Behaviouranddesignofstainlesssteel-concretecompositebeams,JournalofConstructionalSteelResearch,185(2021).
[90]W.Lin,Experimentalinvestigationoncompositebeamsundercombinednegativebendingandtorsionalmoments,AdvancesinStructuralEngineering,24(2020)1456-1465.
[91]Z.M.Liu,X.J.Huo,G.M.Wang,W.Y.Ji,TestandNumericalModelofCurvedSteel-ConcreteCompositeBoxBeamsunderPositiveMoments,Materials(Basel),14(2021).
[92]陈洪伟,贺国栋,王甜,G.He,T.Wang,多梁式工形截面钢混组合梁桥荷载横向分布的参数分析,中外公路,41(2021)161-165.
[93]张天航,张建勋,万二帅,大节段装配式波形钢腹板组合T梁横向分布系数研究,郑州大学学报(工学版),42(2021)105-110.
[94]M.K.Razzaq,K.Sennah,F.Ghrib,Liveloaddistributionfactorsforsimply-supportedcompositesteelI-girderbridges,JournalofConstructionalSteelResearch,181(2021).
[95]F.Alsharari,A.El-Zohairy,H.Salim,A.El-DinEl-Sisi,NumericalinvestigationofthemonotonicbehaviorofstrengthenedSteel-Concretecompositegirders,EngineeringStructures,246(2021).
[96]王花平,考虑滑移效应的组合梁界面作用机理及形变特征土木工程学报,54(2021)41-52.
[97]李嘉,刘凯,王洋,等,轻型组合桥面UHPC-薄面层层间非线性分析,长安大学学报(自然科学版),41(2021)56-64.
[98]V.Vigneri,C.Odenbreit,A.Romero,Numericalstudyondesignrulesforminimumdegreeofshearconnectioninproppedsteel–concretecompositebeams,EngineeringStructures,241(2021).
[99]F.Sadeghi,X.Zhu,J.Li,M.Rashidi,ANovelSlipSensorySystemforInterfacialConditionMonitoringofSteel-ConcreteCompositeBridges,RemoteSensing,13(2021).
[100]周夏芳,王志宇,刘梓峰,等,波形钢腹板体外预应力组合梁...面承载力及应力分布特征研究,建筑结构学报,42(2021).
[101]T.Lou,T.L.Karavasilis,B.Chen,AssessmentofSecond-OrderEffectinExternallyPrestressedSteel–ConcreteCompositeBeams,JournalofBridgeEngineering,26(2021).
[102]尹永胜,曹洪亮,高华睿,等,塑性阶段波形钢腹板组合梁体外预应力筋应力增量研究,工业建筑,51(2021)86-89.
[103]H.Xiao,L.Luo,J.Shi,H.Jiang,Z.Wu,Stressingstateanalysisofmulti-spancontinuoussteel-concretecompositeboxgirder,EngineeringStructures,246(2021).
[104]X.Shao,G.He,X.Shen,P.Zhu,Y.Chen,Conceptualdesignof1000mscalesteel-UHPFRCcompositetrussarchbridge,EngineeringStructures,226(2021).
[105]S.Wang,Y.Zhang,T.Luo,Y.Liu,Elasticcriticalshearbucklingstressoflarge-scalecorrugatedsteelwebusedinbridgegirders,EngineeringStructures,244(2021).
[106]W.Ji,X.Liu,AnalysisoftheShearBucklingStrengthofVariable-SectionCorrugatedSteelWebs,KSCEJournalofCivilEngineering,25(2021)2974-2990.
[107]M.Zhou,Y.Chen,X.Su,L.An,MechanicalperformanceofabeamwithcorrugatedsteelwebsinspiredbytheforewingofAllomyrinadichotoma,Structures,29(2021)741-750.
[108]徐晨,张乐朋,江震,等,短焊钉布置对超高性能混凝土组合桥面板抗弯性能影响,同济大学学报(自然科学版),48(2021)1088-1096.
[109]Z.Hu,Y.I.Shah,S.Yu,CrackingAnalysisofPre-stressedSteel–concreteCompositeGirderatNegativeMomentZone,ArabianJournalforScienceandEngineering,46(2021)10771-10783.
[110]苏庆田,邹迪升,张龙伟,陶仙玲,黄超,后结合预应力组合梁桥的混凝土预应力实效测试与分析,同济大学学报(自然科学版),49(2021)1061-10691058.
[111]苏庆田,苏航,吴飞,橡胶-焊钉组合连接件对钢-混组合梁受力性能影响分析同济大学学报(自然科学版),49(2021)1079-1087.
[112]罗兵,钢-UHPC-NC组合梁负弯矩区受力性能试验研究_,桥梁建设,51(2021)58-65.
[113]H.Wang,T.Sun,X.Shao,C.Tang,L.Yang,Staticbehaviorofasteel-ultrahighperformanceconcretecontinuouscompositeboxgirder,StructureandInfrastructureEngineering,DOI10.1080/15732479.2021.1876739(2021)1-18.
[114]朱劲松,王修策,丁婧楠,等,钢-UHPC华夫板组合梁负弯矩区抗弯性能试验_,东南大学学报(自然科学版),51(2021)404-410.
[115]王洋,钢板条-UHPC组合桥面结构静力及疲劳试验,中国公路学报,34(2021)261-272.
[116]王皓磊,孙韬,刘晓阳,等,钢-UHPC连续组合梁抗弯性能试验,中国公路学报,34(2021)218-233.
[117]X.Zhou,P.Men,J.Di,F.Qin,Experimentalinvestigationoftheverticalshearperformanceofsteel–concretecompositegirdersundernegativemoment,EngineeringStructures,228(2021).
[118]A.Nasiri,T.Shimozato,Y.Mumtaz,Experimentalstudyonthepost-crackingbehaviorofpreflexbeamsundercyclicloading,Structures,29(2021)1390-1403.
[119]C.Xu,H.Xiao,B.Zhang,J.Fu,H.Masuya,Fatiguebehaviorofsteelfiberreinforcedconcretecompositegirderunderhighcyclenegativebendingaction,EngineeringStructures,241(2021).
[120]P.Men,X.Zhou,Z.Zhang,J.Di,F.Qin,Behaviourofsteel–concretecompositegirdersundercombinednegativemomentandshear,JournalofConstructionalSteelResearch,179(2021).
[121]P.Men,J.Di,H.Jiang,X.Zhou,F.Qin,Webshearbucklingofsteel–concretecompositegirdersinnegative-momentregions,EngineeringStructures,237(2021).
[122]Z.-Y.Wang,X.Zhou,Z.Liu,PantingFatigueofTrapezoidalCorrugatedSteelWebswithMixed-ModeCracks,InternationalJournalofSteelStructures,21(2021)576-589.
[123]A.I.Hassanin,H.F.Shabaan,A.I.Elsheikh,Cyclicloadingbehavioronstrengthenedcompositebeamsusingexternalpost-tensioningtendons(experimentalstudy),Structures,29(2021)1119-1136.
[124]F.Alsharari,A.El-Zohairy,H.Salim,A.El-DinEl-Sisi,Pre-damageeffectontheresidualbehaviorofexternallypost-tensionedfatiguedsteel-concretecompositebeams,Structures,32(2021)578-587.
[125]C.H.Ma,P.Deng,T.Matsumoto,FatigueanalysisofaUHPFRC-OSDcompositestructureconsideringcrackbridgingandinterfacialbondstiffnessdegradations,EngineeringStructures,249(2021).
[126]B.Tu,S.Cai,J.Li,H.Liu,Fatigueassessmentofafull-scalecompositebox-girderwithcorrugated-steel-websandconcrete-filled-tubularflange,JournalofConstructionalSteelResearch,183(2021).
[127]黄继荣,王明俊,杨慧,等,基于缺口应力的波形钢腹板结构疲劳分析研究,铁道科学与工程学报,18(2021)425-431.
[128]J.Chen,H.Zhang,Q.-Q.Yu,Monotonicandfatiguebehaviorofsteel-concretecompositebeamssubjectedtocorrosion,Structures,34(2021)1973-1984.
[129]W.K.Hamid,E.P.Steinberg,I.Khoury,A.A.Semendary,K.Walsh,ThermallyInducedBehaviorofPairedInternallyCuredConcreteandConventionalConcreteDecksinCompositeBridges,JournalofBridgeEngineering,26(2021).
[130]G.Zhang,C.Song,X.Li,S.He,Q.Huang,FirePerformanceofContinuousSteel-ConcreteCompositeBridgeGirders,KSCEJournalofCivilEngineering,25(2021)973-984.
[131]C.Song,G.Zhang,V.Kodur,Y.Zhang,S.He,Fireresponseofhorizontallycurvedcontinuouscompositebridgegirders,JournalofConstructionalSteelResearch,182(2021).
[132]F.Zhang,J.Shen,J.Liu,Effectofencasedconcreteonsectiontemperaturegradientofcorrugatedsteelwebboxgirder,AdvancesinStructuralEngineering,24(2021)2321-2335.
[133]D.Wang,B.Tan,X.Wang,Z.Zhang,Experimentalstudyandnumericalsimulationoftemperaturegradienteffectforsteel-concretecompositebridgedeck,MeasurementandControl,54(2021)681-691.
[134]J.-S.Fan,Y.-F.Liu,C.Liu,Experimentstudyandrefinedmodelingoftemperaturefieldofsteel-concretecompositebeambridges,EngineeringStructures,240(2021).
[135]L.Zhu,R.K.-L.Su,J.-X.Huo,G.-M.Wang,TestoftheLong-TermBehaviorofCurvedSteel–ConcreteCompositeBoxBeams:CaseStudy,JournalofBridgeEngineering,26(2021).
[136]张丰,颜东煌,陈常松,D.Yan,C.Chen,大跨度组合梁斜拉桥成桥状态参数敏感性分析交通科学与工程,37(2021)91-97.
[137]Y.-J.Zhu,J.-M.Zhu,Distortionofsteeltub-girderwithtopflangebracingconsideringwarpingrestrainteffect,JournalofConstructionalSteelResearch,187(2021).
[138]M.AboEl-Khier,G.Morcous,Precastconcretedeck-to-girderconnectionusingUltra-HighPerformanceConcrete(UHPC)shearpockets,EngineeringStructures,248(2021).
[139]王德怀,王琦,张玉奇,Q.Wang,Y.Zhang,超宽大跨变截面连续钢混组合梁施工方案比选,中外公路,41(2021)193-197.
[140]录哲元,王晓明,赵宝俊,等,基于MEC-BP代理模型的...腹板连续刚构桥施工线形预测,长安大学学报(自然科学版),41(2021)53-62.
[141]袁帅华,段文强,周聪,陈宁,波形钢腹板部分斜拉桥施工阶段剪力滞效应分析%J中南大学学报(自然科学版),52(2021)4055-4062.